Recent & Current Fire Protection Projects from Kauffman Co.
Gorilla House Houston Zoo
Location:Houston, TX
Project Timeline:August 2013 – Ongoing
Design and Install of new fire sprinkler system inside an entirely unique structure
Texas State Technical College
Location:Fort Bend, TX
Project Timeline:July 2015 – Ongoing
Design and install of fire protection for six to eight buildings as part of Phase II.
Us Coast Guard Base Rebuild
Location:Galveston, TX
Project Timeline:April 2012 – Ongoing
Design and install of three new buildings and floating dock protection for Galveston rebuild, including fire pump house/enclosure and large fire water storage tank
Transtar
Location:Houston, TX
Project Timeline:July 2012 – Ongoing
Building addition and renovation of continuously operating TXDOT Transtar building, including new fire pump
Alley Theatre
Location:Houston, TX
Project Timeline:June 2014 – Ongoing
Design and install of new fire sprinkler systems throughout an expansive remodel of an iconic Houston theatre
Woodbranch Park Phase I & Phase Ii
Location:Houston, TX
Project Timeline:February 2014 – Ongoing
(2) 7 Story Shell Office buildings with (2) 6.5 Story parking garage with standpipe systems Add and relocate Level 1 for tenants, Redesign 5,6,7 for tenant build out during shell construction