Recent & Current Fire Protection Projects from Kauffman Co.
League City Public Safety Building
Location:League City, TX
Project Timeline:September 2013 – Ongoing
Installation of fire sprinkler system in multi-level building including specially designed holding cells
Southmayd Elementary
Location:Houston, TX
Project Timeline:March 2013 – April 2014
Installation of fire sprinklers in two new wings of school, including interconnection of systems through the existing school
Waterway Square Hotel
Location:The Woodlands, TX
Project Timeline:April 2014 – Ongoing
New fire sprinkler systems for new 12-story high rise hotel with conference and meeting centers throughout the first two levels. Fire pump and standpipe system and tie into existing convention center.
Hampton / Homewood
Location:Houston, TX
Project Timeline:Ongoing
Design of fire standpipe drawings for permit set as part of pre-construction service; design and install of new sprinkler systems for dual tenant high rise hotels, including fire pump and standpipe system
Ifly Bunker Hill
Location:Houston, TX
Project Timeline:Ongoing
Design of fire sprinkler, standpipe, fire tank, fire pump for new indoor skydiving facility; custom designs for an entirely unique building.
First United Methodist Church Downtown
Location:Houston, TX
Project Timeline:November 2012- November 2013
Retrofit sprinkler system in historic downtown building, replace existing fire pump, and got variances from COH